Refurbishment of the Covered Way complete

By Richard Lushington, Bursar & Clerk to the Governors

We are delighted to have completed the long-awaited refurbishment of the Covered Way. This was a difficult project owing to it being Grade I listed and it has had to be completed in phases, but the aim was to renovate and where possible restore to original form. See photos from the construction below:

Sadly, it proved impossible to repair the roof as the tiles were bonded from underneath so they all had to be replaced and it was this last stage that took so long. It has looked in a sorry state for too long and especially after it was driven into by a delivery lorry a few years ago. After a great deal of research by the architects, the roof tiles and lime mortar were chosen and these will weather as lichens find a new home and the roof beds in naturally. The underside of the roof has been restored using original techniques and the result of the care and attention paid to it is plain to see.

Every piece of the structure has been refurbished and been give some much-needed TLC. As we did with the Lupton Hall, we looked back at archive pictures to see how it was when first built, hence the removal of the brick in-fills on the north side of the steps up to the Lupton Hall, which were not there originally. We have also replaced the unusual and special oak gutters which have not been seen for a very long time since the originals rotted away. Keeping with the Arts and Crafts heritage of the Covered Way, the replacement gutters and their brackets were carefully constructed by the skilled team involved. 
 
We are lucky to have such historic and special buildings in the Library, Lupton Hall and Covered Way. Ensuring they are fit for use by today’s students and restoring them to their original form may have seemed impossible to achieve, but we would like to think that we have struck the right balance and they will all continue to be amazing spaces for our students to learn and spend time within.